Completed Projects

View some of our completed projects to learn more about the work we have completed for our customers.

Short Overview

PT-005-13, API 610 pumps for NDD-13 project

Customer: PT Wika (Persero) Tbk, End User: Chevron, Scope of supply/ works: Supply CVC condensate pumps, Year completed: 2015.

Odoo - Sample 1 for three columns

PT-008-13, Reciprocating gas compressor for Kerendan gas facilities

Customer: PT Meindo Elang Indah, End User: Ophir Energy, Scope of supply/ works: Supply VRU compressor package, Year completed: 2016.

Odoo - Sample 1 for three columns

PT-010-14, API 610 and ANSI pumps for LNG project

Customer: PT Wika (Persero) Tbk, End User: BP Berau Ltd, Scope of supply/ works: Supply process and utility pumps, Year completed: 2016.

PT-016-14, Compressed air system for STG & boiler project

Customer: PT Rekayasa Industri, End User: Pusri, Scope of supply/ works: Supply 7 sets - 110 kW including air dryer heating and refrigerant type, Year completed: 2016.

Odoo - Sample 1 for three columns

PT-120-15, Gearbox spare parts for STG overhaul for LNG Tangguh

Customer: BP Berau Ltd, Scope of supply/ works: Supply gearbox spare parts for STG overhaul, Year completed: 2017.

Odoo - Sample 1 for three columns

PT-141-17, Rental process pumps for central processing facility

Customer: ExxonMobil Cepu Ltd, Scope of supply/ works: Rental dehydrator transfer pumps and all accessories including 24/7 operations, Year completed: 2018.

Odoo - Sample 1 for three columns

PT-142-17, MRO for LNG Tangguh

Customer: BP Berau Ltd, Scope of supply/ works: Supply 621 MRO items (mechanical, electrical, instrument, and consumables) for 3 years, Year completed: 2020.

Odoo - Sample 1 for three columns

PT-145-17, Rental water transfer pump c/w prime mover for 4 years

Customer: ConocoPhillips Grissik Ltd, Scope of supply/ works: Rental 5 units transfer pumps for Suban drilling operation and all accessories including 24/7 operations, Year completed: 2022.

Odoo - Sample 1 for three columns

PT-150-18, ESP for Sungai Anggur field

Customer: Sele Raya, Scope of supply/ works: Supply ESP system (downhole and surface) including installation, Year completed: 2018.

Odoo - Sample 1 for three columns

PT-157-18, Pump services for central processing facility

Customer: ExxonMobil Cepu Ltd, Scope of supply/ works: Reverse engineering part for Plant/wash water pumps, Year completed: 2018.

Odoo - Sample 1 for three columns

PT-161-18, Multistage pump for PLTP Dieng unit 1

Customer: PT Geodipa Energi (Persero), Scope of supply/ works: Supply multistage pumps with diesel engine driven, Year completed: 2019.

Odoo - Sample 1 for three columns

PT-175-19, Mechanical maintenance for CPP Donggi & CPP Matindok for 1 year

Customer: PT Pertamina EP, Scope of supply/ works: Daily mechanical maintenance services, Year completed: 2020.

Odoo - Sample 1 for three columns

PT-181-19, Rental glycol pumps for central processing facility

Customer: ExxonMobil Cepu Ltd, Scope of supply/ works: Rental glycol pumps and all accessories including 24/7 operations, Year completed: 2020.

Odoo - Sample 1 for three columns

PT-188-19, General mechanical maintenance services (and incl Amendment)

Customer: Medco E&P Natuna Ltd, Scope of supply/ works: Perform in situ sealing, heat exchanger maintenance, fabrication for rotating and static  equipment, Year completed: 2023.

Odoo - Sample 1 for three columns

PT-192-19, Overhaul, Fabrication & Repair Surface & Submersible Pump for 3 years

Customer: PT Medco E&P Indonesia, Scope of supply/ works: Overhaul, fabrication & repair surface & submersible pump, Year completed: 2023.

Odoo - Sample 1 for three columns

PT-195-19, Provision of BPO materials - mechanical package for 3 years

Customer: Premier Oil Natuna Sea BV, Scope of supply/ works: Supply BPO materials (mechanical package) - 630 items, Year completed: 2022.

Odoo - Sample 1 for three columns

PT-213-20, Production support maintenance services for 3 years

Customer: PT Medco E&P Malaka, Scope of supply/ works: Fabrication & repair the production support equipment, Year completed: 2023.

Odoo - Sample 1 for three columns

PT-238-21, Rotating equipment services for 2 years

Customer: PT Pertamina Hulu Sanga-Sanga, Scope of supply/ works: Overhaul and repair the rotating equipment (Pumps, screw compressor and electric Motor), Year completed: 2023.

Odoo - Sample 1 for three columns

PT-265-22, LNG Feed Pump Repair Services

Customer: PT Pelindo Energi Listrik, Scope of supply/ works: Pump repair services including reverse engineering and part fabrication of the LNG feed pump, Year completed: 2023.

Odoo - Sample 1 for three columns

PT-278-23, De-Ethanizer Reflux Pump Repair Services

Customer: Elnusa/ BP Berau Ltd, Scope of supply/ works: Pump repair services including pump impeller re-design and manufacturing, bearing fabrication, casing repair and complete unit testing, Year completed: 2023.